- PROJECT: ADATEPE IRRIGATION PROJECT
- Construction of Adatepe Irrigation Scheme Phase 1
- AUTHORITY: General Directorate of State Hydraulic Works (DSi)
- PROJECT LOCATION: Afşin-Kahramanmaraş-Türkiye
- DATE OF COMPLETION: 2025
- PROJECT: Adatepe Irrigation Scheme Phase 1 concerns the laying of a 40 km-3400 GRP main pipeline to supply water from the Adatepe Reservoir. Water to be supplied as such shall be distributed further through pipelines of varying sizes (Secondary GRP line-20 km, HDPE line of varying sizes, etc.) including the construction of engineering structures over ancillary and tertiary lines. This project will allow modernized irrigation of some 7.13 ha of agricultural land .