• info@intekar.com
  • +90 312 334 4343
  • PROJECT NAME: KOZAN – KADIRLI ROAD, ÇUKURKÖPRÜ-CEYHAN STATE ROAD AND KOZAN CITY CROSSING
  • Kozan-Feke-Saimbeyli-Tufanbeyli-6th Bl. Hd. Construction of Kozan City Crossing Km: 58+600- 67+000, Kozan-Kadirli Road Km: 0+000-22+596 and Ceyhan-Çukurköprü Road Km: 0+000- 35+795 Sections
  • ADMINISTRATION: General Directorate of Highways
  • PROJECT LOCATION: Adana-Turkey
  • COMPLETION DATE: 2026
  • PROJECT INFORMATION: The existing single-lane roads of 36 km length between Kozan-Ceyhan and 18 km length between Adana-Osmaniye provinces are 2X2 divided roads standard. Since this project passes through agricultural areas, the project includes 11 bored pile and prestressed beam bridges, plastic pile and Deep Mixing Column (DSM) applications for soil improvement, DSI irrigation channel crossings, and construction of agricultural field roads. Another part of the project is to create a 5 km long 2X2 drainage line on the Kozan ring road, and to build roads in the Kozan ring road with divided roads and BSK standards.